Project Details
Morningstar Foods (now Saputo Cheese) decided it was time to expand their operations at their Tulare facility to accommodate robotic palletizers. The palletizers had space needs (both floor area and height) that could not be met within the existing plant, thus creating the need to remodel and/or expand the facility to accommodate the new equipment. Because of site constraints a new, higher building was constructed over a portion of the existing plant. After the new structure was weather-tight, the existing structure below was demolished. By incorporating this strategy, the Owners could successfully meet their goals within the site constraints and with minimal disruption to operations. While the concept to build a new building over a portion of the existing plant solved site and operational constraints, it posed some unique structural challenges. For example, new columns and footings were designed to avoid existing columns and footings. Furthermore, columns also had to clear existing equipment and conveyor systems and not obstruct forklift routes. This took careful planning and attention to detail. The existing facility was precisely measured using state of the art survey equipment which gave the design team accurate data from which to develop construction documents. Once the new building was constructed, the existing facility was torn down. No man-hours were lost during construction and Morningstar Foods is now realizing more efficient production.





