Project Details

In 2013 the pedestrian bridge that crossed over Mussel Slough, connecting the children play area and restroom facilities with a dog park and other park amenities, was checked for structural integrity. The bridge had not been properly maintained and was deemed to be dilapidated beyond repair and unsafe to the public. The City of Hanford made the decision that a replacement structure was necessary. The City of Hanford engaged our services to provide a topographic survey of the site, structural and civil drawings and construction staking. The topographic survey was completed in 2013; the civil and structural plans were approved in 2015 and construction began in 2016. This project was unique in that the bridge was premanufactured as two pieces, so the civil design and construction staking was critical. Lane Engineers, Inc. coordinated with the bridge manufacturers and staked the bridge abutments and anchor bolts to the specifications required. The bridge mounting and connecting points fit the anchor bolts that had been designed and staked by Lane Engineers, Inc. perfectly, to the satisfaction of all who were involved.